Latest from Brianna Kufa


CEB: Main Cylinder Prep

12/18/2012

Sketchup Model Additional Materials Required: The Press Feet 1/4″ to 1/2″ Bushing (2) 1/2″ NPTM to 1/2″ NPTF Elbow (2)...

CEB Main Frame: Assemble U-Channel

12/18/2012

Sketchup Model Additional Materials Required: The Prepared U-Channel Wide Cylinder Supports 3/4″x2″ Bolts (16) 3/4″ Galvanized Nuts (16) 3/4″ Washers...

CEB: Stretching the Frame

12/18/2012

Additional Materials Required: Soil Loading Drawer Wide Cylinder Supports 3/4″x2″ Bolts (8) 3/4″ Galvanized Nuts (8)

CEB Shaker Assembly

12/18/2012

Sketchup Model Additional Materials Required: Shaker Mount Shaker Motor Shaker Hammer and coupler 1″ Pillow Block Bearings(2) 1/4″x2″ Bolt (1)...