Find all your DIY electronics in the MakerShed. 3D Printing, Kits, Arduino, Raspberry Pi, Books & more!

Make: Projects

Primary Arms

Assembling the Primary Arms: the main component for connecting the center column of the CEB Press to its support system.

Primary Arms

The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder plate, the Dirt-keeper plate, the Controller Mount, and the Valve Mount.

Steps

Step #1:

PrevNext
Primary ArmsPrimary ArmsPrimary ArmsPrimary Arms
  • On one piece, mark holes on the 4" side, all 1.25" away from the edge for:
  • Two total 3/4” diameter holes at 2” and 70.”
  • Six total 13/16” diameter holes at 27", 37", 39 3/4", 48 1/4", 51", and 63 1/2".

Step #2:

PrevNext
Primary Arms

Use this piece to mark the locations on the other side. They are to be mirrored, so make sure they aren't in the same exact orientation.

Step #3: Punch the Holes

PrevNext
Primary Arms
  • Determine which one is arm A and which is arm B by looking at the diagrams. Label them.
  • On arm A, punch the following holes on the 6” side of the angle iron, measured from the left, each centered 1 3/4” from the long edge: Also, torch the hole for adjusting the rollers at 45". Its shape is shown in the diagrams.
  • Five total 13/16” diameter holes at 9”, 13”, 18”, 28”, and 30" inches.
  • Torch the roller adjustor hole in arm B, 45" from the right, so the holes will be at the same frame location.

blog comments powered by Disqus

Featured Products from the MakerShed

Follow

Get every new post delivered to your Inbox.

Join 25,525 other followers