Make: Projects – Collapsible trashbag frame

Furniture & Lighting
Make: Projects – Collapsible trashbag frame
trash_frame_title_image.JPG

Several months ago, Becky covered my remake of a low quality trash bag holder I bought through a SkyMall-esque catalog. This is how I explained the project at the time:

Trash cans have always sort of annoyed me. They take up so much space, especially if, like me, you favor large cans to minimize the number of trips to the dumpster each week. There’s no practical way to pack a large trash can for storage or transport. If you’re moving, of course, you can fill the can with lightweight stuff like dirty clothes or something, but only if you’re willing to expose your linen to the inside of your trashcan. I always use trash bags, anyway, and for my money if you use a bag the only major function of the can is to hold the bag open. Well, it’s possible to achieve that same function with a much cheaper, lighter, and compact device.

This how-to covers a slightly refined version of my original design, with one of its three legs removed in order to facilitate removing a full bag of trash from the frame. Also, some of the joints have been selectively glued in order to prevent annoying pop-outs without sacrificing collapsibility, and a simpler means of attaching the retaining clips has been devised.

This design is sized to accept 32 gallon trash bags. Tools:

  • Plastic pipe cutter (or mitre saw)
  • Tape measure
  • Drill with 3/16″ bit
  • Small wire cutters

Materials:

  • 126″ nominal 1/2″ Flex-Plus blue plastic electrical nonmetallic tubing (“conduit”)
  • 48″ nominal 1/2″ PVC pipe
  • 4 pcs 1/2″ PVC “tee” fittings, unthreaded
  • 1 pc 1/2″ PC straight coupling, unthreaded
  • 3 pc broom clips, size medium
  • 24″ #6 ball chain
  • 6 pcs #6 “eye” ball chain fittings
  • Acetone
  • Paper towels
  • Clear PVC cement (e.g. Lasco 11-2360), smallest size available

Cutting List:

  • 1 x 50″ length conduit (“long”)
  • 1 x 25″ length conduit (“medium”)
  • 3 x 17″ lengths conduit (“short”)
  • 2 x 24″ length pipe
  • 3 x 8″ #6 ball chain
cut_parts.JPG

Step 1: Cut parts to length

cutting_blue_conduit.JPG
cutting_PVC_pipe.JPG
cutting_ball_chain.JPG

Measure and mark all cuts. If the conduit gives you grief because of its tendency to coil, try marking the lengths you want to cut lightly on a door frame in pencil. Then flatten the conduit against the door so you can measure and mark the length accurately. The plastic pipe cutter will snip right through the conduit in one stroke. To cut the pipe, apply pressure and rotate steadily, like a metal tubing cutter, and it will slice neatly in 10 turns or so. Use wire cutters on the ball chain.


Step 2: Clean up the pipe (optional)

cleaning_up_pipe.JPG

If you’re picky about appearances, clean the factory ink off the outside of the pipes and pipe fittings using a paper towel and a touch of acetone.


Step 3: Assemble bottom ring

bottom_ring.JPG

The bottom of the frame consists of the long conduit joined to the medium conduit in a circle with two “tee” fittings, as shown. The side openings of the “tee” fittings should point perpendicularly away from the plane of the circle, in the same direction. Don’t glue anything yet.


Step 4: Assemble top ring

top_ring.JPG

The top of the frame consists of the three short conduits joined in a circle. One of the three joints is a “straight” fitting, while the other two are “tee” fittings. As before, the side openings of the “tee” fittings should point perpendicularly away from the plane of the circle, in the same direction.


Step 5: Test assembly

test_assembly.JPG

Join the top ring to the bottom ring using the two lengths of pipe as shown. Adjust the angle of the “tee” fittings as needed to center the top ring over the bottom ring.


Step 6: Glue the pieces of the rings together

cement_joints.JPG

Following the label directions on your cement, glue every conduit end into its joint. Do not apply glue to the pipe ends, as these are the demountable joints that allow the frame to collapse for storage or transport. Allow the cement time to set.


Step 7: Drill holes for clip retaining chains

drill_holes.JPG

Once the glue dries, remove the top ring and drill a 3/16″ hole through each of its three fittings (two “tees” and one “straight”), as shown. Drill through both sides of the fitting.


Step 8: Attach retaining clips and chains

attach_clip_step_01.JPG
attach_clip_step_02.JPG
attach_clip_step_03.JPG
clip_attached.JPG

First, attach an eye coupling to one end of a length of ball chain. Then fish the other end through both holes in one of the PVC fittings, and thread the free end through the eye coupling at the other. Then string a second coupling onto the chain, as shown. Finally, thread the free end of the chain through the hole in a broom clip, wrap it back around, and attach it to the loose coupling.


Notes and ideas

with_bag_installed.JPG

The frame is knocked down for storage or transport by removing the top and bottom ring assemblies from the two pipe uprights. The joints between the pipes and the “tee” side-arms could be lubricated with petroleum jelly if this is difficult for you. Personally, I’ve found it’s pretty easy to disassemble the frame by holding the bottom ring against the floor with my feet while pulling up on the pipe with my arms.

What will the next generation of Make: look like? We’re inviting you to shape the future by investing in Make:. By becoming an investor, you help decide what’s next. The future of Make: is in your hands. Learn More.

Tagged

I am descended from 5,000 generations of tool-using primates. Also, I went to college and stuff. I am a long-time contributor to MAKE magazine and makezine.com. My work has also appeared in ReadyMade, c't – Magazin für Computertechnik, and The Wall Street Journal.

View more articles by Sean Michael Ragan
Discuss this article with the rest of the community on our Discord server!

ADVERTISEMENT

Escape to an island of imagination + innovation as Maker Faire Bay Area returns for its 16th iteration!

Prices Increase in....

Days
Hours
Minutes
Seconds
FEEDBACK