CEB Main Frame: Assemble U-Channel
Sketchup Model Additional Materials Required: The Prepared U-Channel Wide Cylinder Supports 3/4″x2″ Bolts (16) 3/4″ Galvanized Nuts (16) 3/4″ Washers (16)

CEB: Main Cylinder Prep
Sketchup Model Additional Materials Required: The Press Feet 1/4″ to 1/2″ Bushing (2) 1/2″ NPTM to 1/2″ NPTF Elbow (2) 1/2″ Hex Nipple (2) 1/2″ Quick Coupler Set (1) 3/4″ Galvanized Nuts (2) 3/4″ Steel Nuts (1)

CEB: Feet
Sketchup Model

CEB Main Frame: U-Channel Prep
Sketchup Model Additional Materials Required: 3/4″ Galvanized Nuts (4) 3/4″ Steel Nuts (10)

CEB Main Frame: Small Components
Sketchup Model Additional Materials Required: 3/4″ Galvanized Nuts (3) 3/4″ Steel Nuts (2)

CEB: Wide Cylinder Supports
Sketchup Model Additional Materials Required: 3/4″x2″ Bolts (2) 3/4″ Steel Nuts (2) 3/4″ Galvanized Nuts (2)


CEB Soil Grate
Sketchup Model Additional Materials Required: Steel Nuts (2)

CEB: Secondary Arms
Secondary arms act as part of the support structure for machines like the CEB Press.

CEB Shaker Assembly
Sketchup Model Additional Materials Required: Shaker Mount Shaker Motor Shaker Hammer and coupler 1″ Pillow Block Bearings(2) 1/4″x2″ Bolt (1) 3/8″x2″ Bolts (4) 1/2″x2″ Bolts (2) 3/8″ Lock Nuts (4) 1/2″ Lock Nuts (2) 3/8″ Washers (8) 3/8″ Lock Washers (4) 1/2″ Washers (4) 1/2″ Lock Washers (4)

CEB Shaker Hammer and Shaft
Sketchup Model Additional Materials Required: 1″ Keyed Coupler 1/4″x 2″ Bolt