Search Our Project Library

  • Reset
CEB: Fit the Drawer Members
Sketchup Model Additional Materials Required: Roller Guides Soil Loading Drawer Wide Cylinder Supports Drawer Members 3/4"x2″ Bolts (16) 3/4" Nuts (16) 3/4" Washers (16) 1/2" Washer (2) 1/2" Lock Washer (2) 1/2" Nut (2)

CEB Main Frame: Install Small Components
Sketchup Model Additional Materials Required: Thin Cylinder Supports Magnet Holder Sensor Holder Leg Holders (2) 3/4" Galvanized Nuts (3)


CEB: Stretching the Frame
Additional Materials Required: Soil Loading Drawer Wide Cylinder Supports 3/4"x2″ Bolts (8) 3/4" Galvanized Nuts (8)

CEB Main Frame: Assemble U-Channel
Sketchup Model Additional Materials Required: The Prepared U-Channel Wide Cylinder Supports 3/4"x2″ Bolts (16) 3/4" Galvanized Nuts (16) 3/4" Washers (16)

CEB: Main Cylinder Prep
Sketchup Model Additional Materials Required: The Press Feet 1/4" to 1/2" Bushing (2) 1/2" NPTM to 1/2" NPTF Elbow (2) 1/2" Hex Nipple (2) 1/2" Quick Coupler Set (1) 3/4" Galvanized Nuts (2) 3/4" Steel Nuts (1)

CEB: Feet
Sketchup Model

CEB Main Frame: U-Channel Prep
Sketchup Model Additional Materials Required: 3/4" Galvanized Nuts (4) 3/4" Steel Nuts (10)

CEB Main Frame: Small Components
Sketchup Model Additional Materials Required: 3/4" Galvanized Nuts (3) 3/4" Steel Nuts (2)

CEB: Wide Cylinder Supports
Sketchup Model Additional Materials Required: 3/4"x2″ Bolts (2) 3/4" Steel Nuts (2) 3/4" Galvanized Nuts (2)


CEB Soil Grate
Sketchup Model Additional Materials Required: Steel Nuts (2)